Dome House Construction Process

Assembly and construction is this easy! Only requires a short period of time!!

The module is used to build the house. Three workers can complete the house construction within two hours.

  1. Basic work

Construct a flat, level foundation following the drawings and construction manual. Also do the plumbing and electrical work.

  1. Assembly of dome pieces

Assemble a total of 12 wall, door and window pieces and 2 ceiling pieces for the dome. Apply the special glue to the toothed joints and fasten them with bolts.

  1. Fitting and outer wall work

After the special glue cures, remove the bolts. Seal the joints and apply the waterproof treatment, and then attach the fittings and skylight. Finally, paint the exterior.

  1. Inside wall and equipment work

Construct the floor, partitions, lighting fixtures, air conditioning and other equipment according to the individual specifications.